Connect Ground Cable To Control Frame - Oracle EAGLE Installation Manual

Table of Contents

Advertisement

Figure 5-17
Secure the cable to the cable brackets with lacing cord.
3.
Cables must be labeled, 145P tags should have "TO" and "FROM" location
4.
information.
Example: FROM MGB (Main Ground Bar), TO system ground bar Control Frame,
CF00.
DO NOT "double lug": The practice of using one bolt through a lug and the ground
5.
bar, and through another lug on the other side of the ground bar, held in place by
one nut.
A bolt through any nut must show at least two threads beyond the nut but no more
6.
than four threads should be showing.

5.3.3 Connect Ground Cable to Control Frame

Caution:
This equipment has a connection between the earthed conductor of the DC
supply circuit and the earthing conductor.
Frame Ground and Logic Ground Cabling Procedures
System Frame Grounding
Chapter 5
5-18

Advertisement

Table of Contents
loading

Table of Contents