Oracle EAGLE Installation Manual page 90

Table of Contents

Advertisement

Note:
DONOT run Logic Ground or Power Cables on the cable horns in the top
middle of a frame. The horn is for Row Alarm Cables only.
warning:
All logic ground connections must be made to the system ground bar.
Repeat steps 2, 3, and 4, on the fuse and alarm panel end.
7.
Note:
1U FAP: On the frame, use straight, two hole lugs, 1/4-inch hole on 5/8-
inch centers, long barrel with window (P/N 804-0817-02). The FAP
Chassis GND and Logic GND use 90-degree, 2-hole lug, 1/4" hole on
5/8-inch centers, long barrel with window (P/N 502-0081-02).
Note:
All other FAPs: #6-gauge lug (P/N 502-0085-R01) must be used on the
fuse and alarm panel end of the cable.
Terminate the fuse and alarm panel end of the cable on the terminal strip at the
8.
position marked LOGICGROUND.
Figure 5-22
1U Fuse and Alarm Panel Rear (P/N 870-2804-01)
Frame Ground and Logic Ground Cabling Procedures
Chapter 5
5-24

Advertisement

Table of Contents
loading

Table of Contents