same time by two people, one in the front and one in the rear to avoid making the frame
tilt.
Only raise the frame high enough to clear the angle created by the front ramp. When the
8.
frame and dolly have been raised enough to clear the angle created by the front ramp,
slowly and carefully roll the frame out of the shipping container.
Note:
For clarity, the frame in the shipping container is shown without system
hardware components.
Figure 4-3
Shipping, Detach Dolly Heavy Duty Frame
With a minimum of two people, carefully move the frame to the next location.
9.
At the correct site location, turn the threaded rods counter clockwise to lower the frame
10.
by raising the wheels of the dolly. Again two technicians must turn the threaded rods at
the same time avoid tilting. Refer to
attached to wheels.
Figure 4-4
for the location of the threaded rods
Chapter 4
Unpacking
4-3