Note:
It may be necessary to drill the central office ground window bar to accept the
3/8-inch bolts on one-inch centers. Apply the 145P cable tags (see
provided to both ends of the ground cable, including the "Do Not Disconnect".
Install the logic ground cable lugs P/N 804-0817-R02 using the 1/4-inch 20 copper-plated
6.
hardware provided (refer to
Tighten the bolts to 68 inch-pounds.
Figure 5-21
System Logic Grounding
Note:
The only ground cables that are terminated to the system ground bar are the
logic grounds from the fuse and alarm panel.