6.1.2 Interface Cable Installation

The procedure in this section is used to install the interface cables. The interface cables, one
per signaling link, contain solid conductor twisted pairs for both directions of transmission in a
single shield. They have connectors at one end for connection to the system backplanes.
Control Shelf Cabling
Chapter 6
Intra-system Cable Installation