Tighten the lugs to:
Verify correct connection with a multimeter by running continuity check.
10.
Replace the clear plastic cover on the back of the fuse and alarm panel.
11.
Secure the power cables to the cable rack with lacing cord.
12.

5.3 Frame Ground and Logic Ground Cabling Procedures

This section covers these procedures:
Ground Frame
Connect Ground Cable to Control Frame
Logic Ground Connections to the System Ground Bar
Logic Ground Cables
Grounding Requirements
danger:
Strictly observe all grounding requirements to reduce the risk of electric
shock.
The system operates as a digital isolated ground plane system in a central office
environment and requires a single connection to the central office ground window. The
system's ground cables must provide the sole grounding connection between the
entire system and the central office grounding.

5.3.1 Recommended Tools

Oracle tools should be labeled "Property of ORACLE" with either a press-on Field Tool
Identification label or Field Tool Identification wrap.
Safety glasses
Power knife
Cable cutters
Cable stripper
Flush cutters
Crimping tool with embossing dies (test before using)
1U FAP, torque to 50 inch-pounds
3U FAP, torque to 25 inch-pounds
Note:
Where the cable leaves the cable rack, the cable must be protected with
fiber paper throughout the system.
Frame Ground and Logic Ground Cabling Procedures