Oracle EAGLE Installation Manual page 79

Table of Contents

Advertisement

Note:
Existing frames that are fused at 40A can be upgraded to support 60A with a
FAP upgrade kit. 60A are required for frames that contain HC-MIMs. Upgrades
will be performed by Oracle personnel. Contact
more information.
Fuse and wire each bus to support 60A if you have a FAP 870-2320-04 Rev J, or
870-2804-01 Rev A.
For Input Power, RTN, and Logic GND use only the following for Fuse and Alarm Panel
connectors:
FAP P/N 870-2804-001; Straight, two-hole lugs, 1/4-inch on 5/8-inch centers, long
barrel with windows (504-0817-02)
All other FAPs; Straight, two-hole lugs, #10 hole on 5/8-inch centers, long barrel with
windows (502-0085-R01)
All connections to the FAP are #6AWG (number 6 American Wire Gage).
list of required wiring sizes based on the length of the cable run. H-tap to the main feed
where larger gauge wire is required for long cable runs.
Use H-taps at the fuse and alarm panel and power board to reduce the wire size to #6 AWG.
Note:
Specific wire sizes may be determined by the site requirements.
Table 5-9
Power Cable Conductor Sizes
Breaker Size in
Cable Length
Amperes
40A
up to 40 ft. (12.2 meters)
up to 70 ft. (21.3 meters)
up to 110 ft. (33.5 meters)
up to 170 ft. (51.8 meters)
up to 200 ft. (61 meters)
up to 220 ft. (67.1 meters)
60A
up to 40 ft. (12.2 meters)
up to 70 ft. (21.3 meters)
up to 110 ft. (33.5 meters)
up to 170 ft. (51.8 meters)
up to 200 ft. (61 meters)
up to 220 ft. (67.1 meters)
Installing Power Cables
My Oracle Support (MOS)
Table 5-9
shows the
Conductor Size (AWG)
#6
#4
#2
1/0
2/0
4/0
#2
1/0
2/0
4/0
350MCM
350MCM