Oracle EAGLE Installation Manual page 45

Table of Contents

Advertisement

Figure 4-9
Raised Floor Installation Elements
warning:
Finger tighten nuts on threaded rods inside the frames above the raised floor
before tightening the nuts below the raised floor.
Refer to
Figure 4-10
when installing the heavy duty frame on a raised floor using
overhead racks, flat washers, and nuts, Cable Rack Mounting Kit.
Chapter 4
Floor Preparation
4-11

Advertisement

Table of Contents
loading

Table of Contents