Frames And Shelves; Unpacking - Oracle EAGLE Installation Manual

Table of Contents

Advertisement

4

Frames and Shelves

4.1 Unpacking

danger:
At least two people are required to safely move and position the frames. Read and
understand this procedure completely before continuing.
Before opening any shipping container, inspect it for evidence of damage during
1.
shipment. Report any damage to the carrier for investigation and possible claims. Also
report any damage to the Oracle site supervisor.
Check the packing slips against the equipment specification list for this installation site.
2.
Report any discrepancies to the
Use the 9/16 inch wrench to remove all of the bolts that hold the front to the shipping
3.
container. Do not discard the bolts. Remove the shipping container front panel. Place the
bolts into the bag provided inside the shipping container. The shipping container will be
returned before and separately from the dolly holding the frame in place. The dolly is
used to move and position the frame. Save all bolts and hardware.
Figure 4-1
Use the front panel of the shipping container as a ramp to remove the frame from the
4.
shipping compartment. Place the ramp against the front of the container making sure the
My Oracle Support
Shipping Container for Heavy Duty Frame
(MOS).
4-1

Advertisement

Table of Contents
loading

Table of Contents