Oracle EAGLE Installation Manual page 34

Table of Contents

Advertisement

The –48VDC power feeds are correctly labeled at the central office power distribution
8.
panel.
There should be an A feed and a B feed for each breaker panel and FAP.
The –48VDC returns are correctly labeled.
9.
Each frame has an A return and a B return for each breaker panel or FAP.
Frames are level.
10.
Earthquake bracing, if any, is properly installed.
11.
Adequate floor clearances have been maintained.
12.
Rear panels are installed.
13.
Cable connections are tight at the backplane connections.
14.
Cable sheets are properly marked and located in door pocket.
15.
All documentation has been received and is available.
16.
Terminals and printers connected to the system are operational.
17.
Data cartridges have been received and are properly stored.
18.
Any attached modems are operational.
19.
Any attached Media Access Units (MAUs) are operational with power indicator on.
20.
Chapter 3
EAGLE Post-Installation Inspection
3-7

Advertisement

Table of Contents
loading

Table of Contents