Interface Cable Installation Order - Oracle EAGLE Installation Manual

Table of Contents

Advertisement

Note:
Run Link Interface Module (LIM) cables on traverse arms, behind IMT and
clock cables.
The ends without connectors are normally terminated on a DSX cross-connect panel
with wire-wrap terminals.
Secure the connector to the designated receptacle on the DSX panel.
1.
Plug the connector in and turn one of the connector screws to start the screw into
2.
the threaded hole.
Start the other screw into the other threaded hole.
3.
With both screws started alternate tightening the screws until both screws are
snug, finger tight. Complete tightening to FIVE inch-pounds only, NO MORE or the
screws will twist off and the connection can be broken.
Termination information is furnished in the Cable Running List in the Equipment
Specification for the site. See the
interface cable cross-connect panel connection.

6.1.2.1 Interface Cable Installation Order

Interface cables should be installed in the following order.
6.1.2.1.1 Control Frame CF-00 Backplane
(P/N 850-0330-04/06/07) or 7333412
Control shelf 11
1101 A through 1108 A (P/N 850-0330-06 or -07 connectors J45 through J38)
1101 B through 1108 B (P/N 850-0330-06 or -07 connectors J59 through J52)
1111 A through 1112 A (P/N 850-0330-06 or -07 connectors J37 and J36)
1111 B through 1112 B (P/N 850-0330-06 or -07 connectors J51 and J50)
Extension shelf 12
1201 A through 1208 A (connectors J24 through J17)
Note:
Tightening must be done in an alternating pattern.
Note:
All cable ends must be labeled "TO" and "FROM" location information
from Port to Backplane.
Intra-system Cable Installation
Interface Cable Installation Order
Chapter 6
for a typical
6-6

Advertisement

Table of Contents
loading

Table of Contents