Oracle EAGLE Installation Manual page 19

Table of Contents

Advertisement

27560RMA#: <assigned by Oracle>
After the frame is positioned and the dollies are removed from the frame, the dollies are
3.
returned to the same address as the shipping container listed above.
If the equipment is being immediately installed ship the dollies back to Oracle in the crate
after use. After installing the equipment bolt the dollies securely in the crate and return to
Oracle.
OR
If the equipment is not being immediately installed ship the dollies back to Oracle in the
box supplied with the crate. After unpacking the equipment return the crate to Oracle and
retain the box to return the dollies. After installing the equipment remove the dollies and
return to Oracle in the supplied box.
Note:
It is the site supervisor's responsibility to assure the crate and dollies are
returned to Oracle.
Chapter 1
Hardware Repair and Return
1-7

Advertisement

Table of Contents
loading

Table of Contents