Procedure - Replacing B Frame Clock Cables - Oracle EAGLE Installation Manual

Table of Contents

Advertisement

000
000
;
Verify that both BITS clocks are either in IDLE or ACTIVE state on both ACTIVE
14.
and STANDBYMASP
All underlined cards-with-bad-CLK values should equal zero.
If any other A frame clock cables need to be replaced in the system repeat
15.
through
After all the A frame clock cables in the system are replaced secure the cables
16.
with tie wraps or lacing cord according to specifications.
If any B frame clock cables need to be replaced move to the next Procedure
17.
Replacing B Frame Clock Cables in this document
If no other frame clock cables are to be replaced and if the pin protectors are
18.
needed remove the ID pin protectors.
If no other frame clock cables need replacing, return the plastic panels that were
19.
removed for this procedure to original locations. Put all plastic panels back in
place.
6.6.2 Procedure — Replacing B Frame Clock Cables
This procedure explains the replacement of one B frame clock cable. The steps show
the replacement of one frame clock cable and are repeated for every frame clock
cable that is to be replaced.
Remove any plastic panels from the back of all shelves that require the frame
1.
clock cables replaced.
Install pin protectors on all shelves that require the frame clock cables to be
2.
replaced.
HS SECONDARY CLK
= Idle
SYSTEM CLOCK
# Cards using CLK A = 7
# Cards using CLK B = 0
# Cards using CLK I = 0
Command Completed.
HS SYSTEM CLOCK
# Cards using HS CLK A = 1
# Cards using HS CLK B = 0
# Cards using HS CLK I = 0
Command Completed.
14
A Clock and B Clock Cable Replacement
PST
SST
IS-NR
Active
# Cards with bad CLK A =
# Cards with bad CLK B =
PST
SST
IS-NR
Active
# Cards with bad HS CLK A = 0
# Cards with bad HS CLK B = 0
Chapter 6
AST
-----
AST
-----
5
6-88

Advertisement

Table of Contents
loading

Table of Contents