Oracle EAGLE Installation Manual page 204

Table of Contents

Advertisement

Figure 6-42
Backplane P/N 850-0356-04 Extension Shelf
Remove the other end of the frame clock cable from the next shelf's B CLKIN connector.
9.
Select a new frame clock cable and connect it to the B CLKOUT connector, refer to 8.
10.
Route the clock cable in the frame following the routing directions in this manual.
11.
Connect the other end of the new frame clock cable from B CLKOUT, refer to 10, to the
12.
next shelf's B CLKIN connector.
Issue the command to report clock status.
13.
rept-stat-clk
Response to the clock status command is displayed.
tekelecstp 03-02-10 05:34:03 HST Rel XX.x.x-XX.x.x
rept-stat-clk
Command entered at termoinal #1.
;
tekelecstp 03-02-10 05:34:03 HST Rel XX.x.x-XX.x.x
CARD LOC= 1114 (Standby)
PRIMARY BITS
SECONDARY BITS
HS PRIMARY CLK
HS SECONDARY CLK = Idle
CARD LOC= 1116 (Active)
= Active PRIMARY BITS
= Idle
SECONDARY BITS
= Active HS PRIMARY CLK
A Clock and B Clock Cable Replacement
= Active
= Idle
= Active
Chapter 6
6-91

Advertisement

Table of Contents
loading

Table of Contents