Oracle EAGLE Installation Manual page 175

Table of Contents

Advertisement

Figure 6-31
Control Shelf (P/N 850-0330-06 or -07) BITS Connectors
Obtain the two new primary and secondary high‑speed source and composite
2.
clock cables (P/N 830‑0873‑xx or P/N 830‑1189‑xx). Cut out the cable ties along
the route of the existing composite clock cables (P/N 830‑0226‑xx).
Route the new primary and secondary high‑speed source and composite clock
3.
cables (P/N 830‑0873‑xx or P/N 830‑1189‑xx) to the frame using new cable ties.
Note:
Route but do not connect the new cables to the back panel at this time to
avoid any accidental pull on cable connectors that could disconnect them
from the composite clock source. Always route clock cables on separate
cable racks, if provided, for redundancy.
Prior to cable replacement, check your system for any troubles. At the EAGLE
4.
terminal, enter:
Chapter 6
Source Timing
6-62

Advertisement

Table of Contents
loading

Table of Contents