Oracle EAGLE Installation Manual page 188

Table of Contents

Advertisement

Route the new HS source clock cables (P/N 830‑0873‑xx) using new cable ties. Route
5.
the primary and secondary HS clock cables from the customer's high‑speed clock
sources to the EAGLE control shelf backplane near connectors J57 and J56.
Note:
Route but do not connect the new cables to the backpanel at this time to avoid
any accidental pull on cable connectors that could disconnect them from the
composite clock source. Always route clock cables on separate cable racks, if
provided, for redundancy.
Ensure that each tie‑wrap strap is cut flush with the tie‑wrap head so that no sharp edges
are exposed.
Prepare the open end of the new primary high‑speed source and composite clock cable
6.
(P/N 830‑0873‑xx or P/N 830‑1189‑xx) for connection to the customer's primary clock
and high‑speed clock sources. Remove the outer insulation to expose the wires.
Slide on a 1‑1/2 inch length of shrink‑wrap tubing. Center the tubing on the end of the
7.
cable insulation before shrinking tubing with a heat gun.
Connect the open cable end wires to the site primary and secondary high‑speed clock
8.
sources. Connect the primary and secondary HS source clock source cables (P/
N 830‑0873‑xx or P/N 830‑1189‑xx) to the wires attached to connector P1, pins 10 and 3,
on each cable.
Figure
6-354 shows the connector pin outs of the high‑speed source clock cable adapter
cable (P/N 830‑0873‑xx or P/N 830‑1189‑xx).
Chapter 6
Source Timing
6-75

Advertisement

Table of Contents
loading

Table of Contents