warning:
Metal points on Printed Circuit Boards conducts -48VDC and can cause shorts,
shocks, and damage if not handled properly.
Figure 6-49
CUST ALM 1 J35 and (not supported) CUST ALM 2 J66 Connectors
on Control Shelf Backplane -06 or -07
Route the cable up the left side of the control frame, viewed from the rear, over to the
4.
miscellaneous frame containing the holdover clock, and down the left side of the
miscellaneous frame to the cable tie bar next to the alarm connections, see
Tie-wrap the cable to the control shelf cable tie bar at the rear of the shelf.
5.
Pull the slack out of the cable towards the holdover clock.
6.
Dress the cable neatly and tie-wrap to the cable tie bars at the side of the frames.
7.
Chapter 6