Connecting The Line Voltage; Connecting The Unit - Sirona ORTHOPHOS SL 2D Installation Manual

Hide thumbs Also See for ORTHOPHOS SL 2D:
Table of Contents

Advertisement

8 Electrical connection
8.2 Connecting the line voltage
82
8.2

Connecting the line voltage

IMPORTANT
When operating the unit at exhibitions and trade fairs, read the chapter
entitled "Using demo mode – operation without radiation release".
8.2.1

Connecting the unit

DANGER
Perilous shock hazard!
Switch off the power supply connection before connecting the line
voltage.
DANGER
Perilous shock hazard!
Fixed connection!
Installing a mains plug instead of the specified fixed connection infringes
international medical regulatory actions and is prohibited. In case of
error, this puts patients, users, and other parties seriously at risk.
PE
A
B
A
Power cable to the unit
B
Second protective ground wire
C
Device
IMPORTANT
The unit is suitable for connection to networks of 200-240 V and 50-60
Hz, ±10%.
Connect the unit to the central distributor of the building installation,
preferably using a 3-wire power cable (N, L, PE, at least 3x2.5 mm² or 3x4
mm² (14 AWG or 12 AWG)).
WARNING
Potentially lethal shock hazard!
Be sure to connect the second protective ground wire to ground.
Installation Manual ORTHOPHOS SL
L
N
PE
C
A
25 A circuit breaker B
Sirona Dental Systems GmbH
L
N
PE
B
A
B
.
64 95 142 D3632
D3632.031.01.02.02 03.2016

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Orthophos sl 2d / cephOrthophos sl 3dOrthophos sl 3d / ceph

Table of Contents