Sirona ORTHOPHOS SL 2D Installation Manual page 62

Hide thumbs Also See for ORTHOPHOS SL 2D:
Table of Contents

Advertisement

5 Installation: X-ray unit
5.4 Installing the floor stand (option 2)
62
X
W
5. Drill the fastening holes in the floor through the holes in the base
plate. Remove the drilling dust with a vacuum cleaner.
6. Slide the wall plugs (W) through the base plate and into the drillings.
7. Use the five screws and washers (X) to screw the base plate to the
floor.
Sirona Dental Systems GmbH
Installation Manual ORTHOPHOS SL
64 95 142 D3632
D3632.031.01.02.02 03.2016

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Orthophos sl 2d / cephOrthophos sl 3dOrthophos sl 3d / ceph

Table of Contents