5 Installation: X-ray unit
5.4 Installing the floor stand (option 2)
56
Installing the floor stand
NOTICE
Possible transport damage
Leave the center styrofoam packaging attached to the unit for
protection.
1. Transport the unit as close as possible to the ultimate installation
location.
2. Remove the surrounding packaging, the two lateral styrofoam parts,
and the profile cover (A).
3. Loosen the nuts with washers (B) on both sides of the pallet (or
wooden support).
4. Take off the pallet (or wooden support).
5. Remove the threaded bolts (C).
The nuts (D) on the unit may remain inside the unit when the threaded
rods are removed. Remove the nuts.
6. Remove the carrying handles (E) from the holders (F) on the
underside of the pallet.
Sirona Dental Systems GmbH
Installation Manual ORTHOPHOS SL
64 95 142 D3632
D3632.031.01.02.02 03.2016