Checking The Tube Current - Sirona ORTHOPHOS SL 2D Installation Manual

Hide thumbs Also See for ORTHOPHOS SL 2D:
Table of Contents

Advertisement

12 Startup, measurements and tests (for USA/Canada only)
12.7 Checking the tube current
Preparing the measurement
A
184
12.7

Checking the tube current

NOTICE
Damage to the measuring unit
The ring assembly and the tube assembly move during the
measurement.
Make sure that the measuring wires are sufficiently long to allow for the
ring movement and that the measuring unit is in a secure position so that
it will not fall down.
1. Switch off the unit (see Operating Instructions).
DANGER! After switching off the unit, wait at least 4 minutes (LED
V500 on the DX6 must no longer be on) before removing the cover
on the tube assembly.
2. Loosen the screw (A) and remove the lid of the tube assembly cover
(B).
B
3. Loosen the 4 screws (F) and remove the cover plate (G).
F
G
Sirona Dental Systems GmbH
Installation Manual ORTHOPHOS SL
64 95 142 D3632
D3632.031.01.02.02 03.2016

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Orthophos sl 2d / cephOrthophos sl 3dOrthophos sl 3d / ceph

Table of Contents