Sirona ORTHOPHOS SL 2D Installation Manual page 95

Hide thumbs Also See for ORTHOPHOS SL 2D:
Table of Contents

Advertisement

Sirona Dental Systems GmbH
Installation Manual ORTHOPHOS SL
G
I
H
64 95 142 D3632
D3632.031.01.02.02 03.2016
Positioning the ceph arm
F
L
1. Position the CEPH cardboard packaging (L) next to the unit as a
cardboard support.
2. Position the ceph arm with the styrofoam packaging on top.
3. Remove the adhesive tape and the cover (E) from the ceph
packaging.
4. Break off the wall part (F) of the packaging at the perforation.
5. Slide the cardboard support with the ceph arm up to the wall so that
the drill holes of the support arm are horizontally aligned with the
positions of the threaded bolts.
CAUTION
X-rays
Be sure to observe the radiation protection regulations applicable in
your country.
➢ No person may be positioned in the unit when it is switched on.
6. Switch on the unit (G).
 During the unit startup phase, the start screen appears on the
control panel.
 The unit's self-adjustment routine begins.
7. Acknowledge the error messages that appear using the R key (H) on
the control panel.
 The main menu and help message H301 appear. You are
requested to move the unit to its starting position.
8. Press the R key (H) on the control panel.
 The unit moves to its starting position.
10 Installation: Ceph arm
10.3 Installation
E
95

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Orthophos sl 2d / cephOrthophos sl 3dOrthophos sl 3d / ceph

Table of Contents