5 Installation: X-ray unit
5.2 Tools, materials, and measurement tools you will need
Ø 12mm
48
Additional requirements for installation with floor stand:
● Masonry drill bit 12mm (1/2")
Masonry drill bit 12mm
Graphics: Neutral Allen wrench
Hexagon socket 2 mm
● Allen key 2 mm
Socket wrench
● Socket wrench and extension
Socket wrench and extension 17
Wrench insert 17
5.2.2
Measurement tools
● Multimeter or ammeter
● Test unit to measure unit leakage current
e.g. Bender tester or line-frequency, high-resistance measurement
voltage source (isolation transformer) and measuring circuit (MD)
that meets the requirements of IEC 60 601-1.
● Current source for protective conductor test
Technical data:
– No-load voltage min. 4 V - max. 24 V
– Short-circuit current min. 0.2 A
Sirona Dental Systems GmbH
Installation Manual ORTHOPHOS SL
64 95 142 D3632
D3632.031.01.02.02 03.2016