Sirona ORTHOPHOS SL 2D Installation Manual page 54

Hide thumbs Also See for ORTHOPHOS SL 2D:
Table of Contents

Advertisement

5 Installation: X-ray unit
5.3 Wall mounting (standard and option 1)
54
4. Level the unit in both directions with the help of the spirit level by
adjusting the unit base:
Align the stand by placing the spirit level on the side and rear of the
stand (I).
Check the ring in both directions using the spirit level (J).
5. Drill through the recesses of the stand into the floor.
6. Insert plugs (K) and check the alignment of the stand again.
7. Screw the stand to the floor with the two wood screws (L) and
washers (M).
8. Attach the covers of the wall holder(s).
Sirona Dental Systems GmbH
Installation Manual ORTHOPHOS SL
64 95 142 D3632
D3632.031.01.02.02 03.2016

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Orthophos sl 2d / cephOrthophos sl 3dOrthophos sl 3d / ceph

Table of Contents