Sirona ORTHOPHOS SL 2D Installation Manual page 128

Hide thumbs Also See for ORTHOPHOS SL 2D:
Table of Contents

Advertisement

11 Commissioning, demo mode and repacking
11.11 Using demo mode – operation without radiation release
I
128
1. Switch the unit on and move it to its packing height by actuating the
up/down keys on the control panel.
 Bite block height = 965 mm (displayed as height on the control
panel)
 Bottom edge of slide cover = 702 mm
2. Move the diaphragm and the sensor unit to the packing
position [ → 161] via the service routines S021.3 and S021.4.
3. Turn the rotation unit to the packing position (see section
"Delivery [ → 28]" / "ORTHOPHOS SL [ → 30]".
4. IMPORTANT: Attach the tube assembly guard (supplied in the
package) to the X-ray tube assembly and secure the packing position
H
of the tube assembly with the tension belt (supplied in the package).
5. Attach the transport safety device.
The transport safety device is attached in reverse sequence to how it
is detached [ → 63].
6. Pack the panoramic X-ray unit
(Packing condition - see section Delivery [ → 28]).
Packing the cephalometer
1. Call service routine S034.6 [ → 133].
 After calling the service routine, an inactive progress indicator is
displayed in selection field 1. Selection field 2 shows the
characters "FFFF".
2. Touch the T key (A).
 The cephalometer moves to the packing position. The procedure
is visualized by an active progress indicator in selection field 1.
 When the cephalometer has reached its packing position, "0000"
is displayed in selection field 2.
3. Exit the service routine [ → 136].
Sirona Dental Systems GmbH
Installation Manual ORTHOPHOS SL
64 95 142 D3632
D3632.031.01.02.02 03.2016

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Orthophos sl 2d / cephOrthophos sl 3dOrthophos sl 3d / ceph

Table of Contents