Gestetner B070 Service Manual page 650

Table of Contents

Advertisement

FUSING
The table below describes the sequence for switching the lamps on and off to
control the fusing temperature.
NAME
Fusing Lamp A
Fusing Lamp B
Fusing Lamp C
CONDITION
Warm up, Re-load (See Note 1)
(before the hot roller temperature reaches
the hot roller idle rotation start temperature
of 140°C)
Warm up, Re-load
(after the hot holler reaches temperature
higher than the hot roller idle rotation start
temperature of 140°C)
Standby
Normal Size Paper Copying
(ON/OFF timing fixed at 1 sec. intervals)
Small Size Paper
(ON/OFF timing fixed at 4 sec. intervals)
Note 1
Re-load temperature is the temperature while the machine is idling.
Note 2
When a small paper size (smaller than A4/LTR) is selected for the job, all
three lamps remain on until the fusing unit reaches the target temperature,
then Lamp C switches off to prevent the ends of the hot roller from over
heating.
B070/B071
CÓPIA NÃO CONTROLADA
Fusing Lamp A (Center)
Fusing Lamp B (Length)
Fusing Lamp C (Ends)
WATTAGE
NA
EUR/A
800 W
730 W
530 W
530 W
560 W
540 W
LAMPS
USED
6-134
CÓPIA NÃO CONTROLADA
B070D937.WMF
FUNCTION
Heats center of the hot roller.
Heats length of the hot roller.
Heats ends of the hot roller.
CONTROL SEQUENCE
A" B" C
3
ON:
(See Note 2)
2
ON:
B " C
1
ON
B, C Alternates
ON
A " B " C
3
OFF C " B " A
ON
A " B
2
OFF B " A
SM

Advertisement

Table of Contents
loading

This manual is also suitable for:

B071

Table of Contents