Gestetner B070 Service Manual page 852

Table of Contents

Advertisement

INSTALLATION PROCEDURE
[C]
15. Attach the ground plate [A] (
This is the ground with the flat plate attached with 2 vertical screws.
16. Open the front door of the finisher.
17. Pull out the lock lever [B] of the finisher (
installed, pull out the lock lever of the cover sheet feeder.)
18. Dock the Z-folding unit to the finisher (or cover sheet feeder).
19. Push in the lock lever [B] of the finisher (or cover sheet feeder) and fasten it (
x 1).
20. Above the lock lever [B], fasten the screw [C] (
21. At the rear of the finisher, in the lower left corner fasten the rear lock bracket
[D] (
x 1).
B660
CÓPIA NÃO CONTROLADA
[B]
x 2) to the finisher (or the cover sheet feeder).
6
CÓPIA NÃO CONTROLADA
[D]
B660I011.WMF
[A]
x 1). (If the cover sheet feeder is
x 1).
SM

Advertisement

Table of Contents
loading

This manual is also suitable for:

B071

Table of Contents