Scheduling An Nqa Test Group; Displaying And Maintaining Nqa - H3C S5500-EI series Operation Manual

Hide thumbs Also See for S5500-EI series:
Table of Contents

Advertisement

Operation Manual – NQA
H3C S5500-EI Series Ethernet Switches

1.10 Scheduling an NQA Test Group

With this configuration, you can set the start time and time period for a test group to
perform the test and start the test.
I. Configuration prerequisites
Before scheduling an NQA test group, make sure:
Required test parameters corresponding to a test type have been configured;
For the test which needs the cooperation with the NQA server, configuration on
the NQA server has been completed.
II. Scheduling an NQA test group
Follow these steps to schedule an NQA test group:
Enter system view
Schedule an NQA test
group
Configure the maximum
number of the tests that
the NQA client can
simultaneously perform
Caution:
After an NQA test group is scheduled, you cannot enter the test group view or test type
view.

1.11 Displaying and Maintaining NQA

Display NQA test operation information
Display NQA server status
To do...
system-view
nqa schedule
admin-name
operation-tag start-time
now lifetime forever
nqa agent
max-concurrent number
To do...
Use the command...
display nqa { result | history }
[ admin-name operation-tag ]
display nqa server status
1-22
Chapter 1 NQA Configuration
Remarks
Required
Optional
The default number is 2
Use the command...

Advertisement

Table of Contents
loading

Table of Contents