Setting By Gppw - Mitsubishi Electric F920GOT-K Hardware Manual

Got-f900 series graphic operation terminal
Table of Contents

Advertisement

GOT-F900 SERIES (CONNECTION)
11.3.2

Setting by GPPW

Set the switches in the QJ71C24(-R2) using "I/O assignment" of the GX Developer.
For details of the setting, refer to the GX Developer OPERATING MANUAL.
1) I/O assignment
Set the type of the unit attached on the base unit and the switches in the QJ71C24(-R2).
[Open procedure]
"GX Developer" → "PLC Parameter" → "I/O assignment"
[Display contents]
a) Type
Set "Intelli".
b) Model name
Set the model name of the attached unit (QJ71C24 or QJ71C24-R2).
c) Points
Set "32".
d) Start XY
Set the head I/O signal number (hexadecimal) of the target unit.
2) Switch setting for the I/O unit/intelligent function unit
Set the transmission specifications, the communication protocol, etc. between the GOT and
connected equipment.
[Open procedure]
"GX Developer" → "PLC Parameter" → "I/O assignment" → "Switch setting"
The contents of setting vary depending on the CH (interface number) of the serial communication
unit connected to the GOT.
Set the following in accordance with the connected CH.
CH connected to GOT
CH1
CH2
Connection of MELSEC-Q Series PLC 11
Contents of setting
11-10

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents