This section explains the caution on installation of the GOT-F900 on the panel face as well as the
installation procedure.
4.4.1

Caution on installation

When installing the GOT on the control panel, etc., make sure that the display unit is set at an angle
shown in the figure below.
If the GOT is installed at any other angle, the GOT may be deteriorated earlier.
1) F920GOT-K, F930GOT, F930GOT-K and F940GOT
When installing the GOT inside the panel while placing the screen laterally, set the installation angle
to 0 to 90° while the temperature inside the panel during operation is 0 to 50°C.
Lateral installation
2) F940WGOT
When installing the GOT on the panel surface while placing the screen laterally, set the installation
angle to 90° while the temperature inside the panel during operation is 0 to 50°C. When the required
installation angle is other than 90°, then the temperature should be 0 to 40°C.
Lateral installation
When installing the GOT on the panel surface while placing the screen longitudinally, set the
installation angle to 90° while the temperature inside the panel during operation is 0 to 40°C.
Longitudinal installation
Installation and Wiring of F920GOT-K/F930GOT(-K)/F940(W)GOT 4
90°
Display unit
GOT
Panel
surface
90°
90°
Display unit
GOT
Panel
surface
90°
90°
Display
unit
GOT
Panel
surface
90°
In the case of horizontal installation,
the temperature is 0 to 40°C.