GOT-F900 SERIES (CONNECTION)
5.1.2
Handy GOT (RH model)
Handy GOT
External cable
Wiring outside panel
F9GT-RHCAB
Installation and Wiring of Handy GOT 5
Cable to PLC
Wiring inside panel
F9GT-RHCAB2
To PLC
For power supply and
operation switches
F9GT-RHCAB3
To PLC
For power supply and
operation switches
Prepared by user
To PLC
For power supply and
operation switches
Supplied from external
power supply
24V DC
1
2
3
4
PLC
5
6
7
8
9
10
5-7