Mitsubishi Electric F920GOT-K Hardware Manual page 139

Got-f900 series graphic operation terminal
Table of Contents

Advertisement

GOT-F900 SERIES (CONNECTION)
2) Attaching the sheet
a) Remove the operation switch cover.
O p e r a t i o n s w i t c h
c o v e r
S c r e w d r i v e r
b) Insert the sheet.
Insert it into the following position shown below of the Handy GOT.
c) Attach the operation switch cover.
L e t i t b e s l i g h t l y w a r p e d .
* 1
* 3
* 1
* 2
* 3
* 1
* 2
S l i d i n g d i r e c t i o n
N a m e s h e e t i n s e r t i o n s l o t
* 3
Installation and Wiring of Handy GOT 5
Insert a screwdriver into the clearance *1 or *3
between the operation switch cover and the main
unit, then slowly push the switch cover up.
When the either side *1 or *3 comes off, pull it in the
sliding direction shown on the left to remove it.
Align the operation switch cover with a protrusion in
the position *1 or *3 shown in the figure in a) above,
then attach the operation switch cover while flexing
it slightly.
O p e r a t i o n s w i t c h
c o v e r
5-37
1
2
3
4
5
6
7
8
9
10

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents