Mitsubishi Electric F920GOT-K Hardware Manual page 73

Got-f900 series graphic operation terminal
Table of Contents

Advertisement

GOT-F900 SERIES (CONNECTION)
This section explains installation on the panel face and wiring of the power supply, etc.
Wiring and setting procedures
This section introduces the procedure to connect the GOT-F900 to connected equipment such as PLC.
1.
Preparation
Item name
Outline of Connection
Name of each Part
Processing of Panel Face You can learn the dimension of the processing on the panel face.
Installation
Connector Pin Layout
and Signal Name
2.
Wiring
Item name
Outline of Internal Wiring
Wiring for 24V DC and
5V DC Power Supply and
Class D Grounding
Handling of function keys
3.
Setting
Item name
Setting of Connected
Equipment for GOT
Installation and Wiring of F920GOT-K/F930GOT(-K)/F940(W)GOT 4
You can learn the outline of the connection method.
You can learn the name of each part of the F930GOT/F940(W)GOT.
You can learn the method to install the F920GOT-K/F930GOT/F930GOT-
K/F940(W)GOT.
You can check the connector signal names.
You can check block diagrams of portions requiring wiring and the
internal wiring.
You can check the methods to wire the 24 VDC power supply and
perform Class D grounding.
You can learn how to use the function keys.
(Setting in the screen creation software is required.)
You can learn the method to make the functions and LEDs of the function
keys available using the screen creation software.
Description
Description
Description
1
2
Reference
4.1
4.2
3
4.3
4.4
4.5
4
Reference
4.6
5
4.7
4.8
6
Reference
4.9
7
8
9
10
4-3

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents