Mitsubishi Electric F920GOT-K Hardware Manual page 367

Got-f900 series graphic operation terminal
Table of Contents

Advertisement

GOT-F900 SERIES (CONNECTION)
3) GT Designer
[Creation]
a)Open GT Designer.
b)Click the [New] button.
c)Set the following.
d)Set CPU direct connection (RS-422) of the GOT-F900.
e)Set the following.
Operation
GOT type: F940WGOT (480 × 234)
F940GOT (320 × 240)
F930GOT (240 × 80)
PLC type: FREQROL
Selection of "GOT type"
GOT type
F940WGOT(480×234)<WIDE>
F94*GOT(320×240)
F93*GOT(240×80)
Click [OK].
Click the check box of "Use Serial Port, Setup, Language, Menu
Key" to give a check mark ($).
Click the "Setup" tab.
Port
: RS-422
Type
: CPU
DST Station No. (Station No.) : 00
GOT Station No. (−)
Connection of FREQROL (S500/E500/A500) Inverter 13
Model name
F940WGOT
F940GOT
Handy GOT
F930GOT-K
F930GOT
: −
Display (screen name)
The "Select Project"
dialog box appears.
The "GOT/PLC Type"
dialog box appears.
The "Project Auxiliary
Settings" dialog box
appears.
13-29
11
12
13
14
15
16
17
18
19
20

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents