Operation steps

1.4
Operation steps
Start command
Set from the PU
Fig. 1-3:
1 - 6
Initial setting
Frequency command
Inverter
output
frequency
Time [s]
ON
Start command with FWD/REV on
the operation panel (PU).
How to
give a frequency
command?
Change frequency with
ON/OFF switches
connected to terminals
(multi-speed setting).
(PU)
(External)
´
²
Set from the PU
Flow chart of the operation steps
Step of operation
Installation/mounting
Wiring of the power
supply and motor
Control method selection
How
to give a start
command?
Perform frequency
Perform frequency
setting by a voltage
setting by a current
output device
output device
(Connection across
(Connection across
terminals 2 and 5).
terminals 4 and 5).
(External)
(External)
Change of frequency
with ON/OFF switches
connected to terminals
(multi-speed setting).
(PU)
(External)
¾
µ
³
·
»
Start command using the PU connector and
RS-485 terminal of the inverter and plug-in
option (Communication).
Connect a switch, relay, etc. to the
control circuit terminal block of the
inverter to give a start command.
(External)
How to
give a frequency
command?
º
Perform frequency
Perform frequency
setting by a voltage
setting by a current
output device
output device
(Connection across
(Connection across
terminals 2 and 5).
terminals 4 and 5).
(External)
¸
Introduction
¿
(External)
¹
I002342E

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents