Dräger Atlan A100 Instructions For Use Manual page 71

Anesthesia workstation
Hide thumbs Also See for Atlan A100:
Table of Contents

Advertisement

6. Insert the new O
After the O
sensor takes place. The initialization lasts 30 minutes. The 30 minutes start when
the mains power supply is established.
4.3.2
Assembling and inserting the O
1. Place the sensor cap (1) on the O
2. Turn the knurled nut (2) about 90° clockwise. Turn it until the palpable resistance
is overcome and a click is heard. The sensor cap is now fitted.
|
Instructions for use
Atlan A100 (XL), A300 (XL), A350 (XL) SW 2.1n
sensor cell (6) into the O
2
sensor cell has been inserted, the initialization phase of the O
2
Assembly and preparation
sensor.
2
6
sensor
2
sensor.
2
2
71

Advertisement

Table of Contents
loading

Table of Contents