Dräger Atlan A100 Instructions For Use Manual page 121

Anesthesia workstation
Hide thumbs Also See for Atlan A100:
Table of Contents

Advertisement

Prerequisites:
– The vaporizers are closed. The control dial is in the 0 position.
– The APL valve is set to 30.
– All flow control valves of the gas mixer are closed.
Quick tightness check
Checking the inner hose:
1. Connect the breathing circuit as follows:
a. Connect the hose (1) to the inspiratory port (2).
b. Connect the coaxial test adapter (3) to the expiratory port (4).
c. Remove the elbow (5) from the hose (6).
d. Connect the hose (6) to the coaxial test adapter (3).
2. Touch the Tests... button.
3. Touch the System test button.
The checklist opens and the breathing system pressure is displayed in the lower
left-hand corner.
4. Press the O
pressure no longer rises.
5. Release the O
6. Wait until the pressure stabilizes between 15 and 30 hPa. If the pressure drops
further, the hose is leaking.
|
Instructions for use
Atlan A100 (XL), A300 (XL), A350 (XL) SW 2.1n
2
1
+ key and keep it pressed until the displayed breathing system
2
+ key.
2
Tests
4
3
5
6
121

Advertisement

Table of Contents
loading

Table of Contents