Tests
7.5.3
Breathing circuit
Prerequisite:
– Breathing system is complete and locked.
– Breathing system cover is fitted.
1. Hoses (1) and filters, e.g., at the Y-piece (2), are connected properly.
2. Extendable hoses (3) are extended to the length intended for use.
3. Remove the water from the hoses (4).
130
Do not change the length of the hoses after the test is done.
4
Instructions for use
2
1
3
|
Atlan A100 (XL), A300 (XL), A350 (XL) SW 2.1n