Tool Usage Test - HEIDENHAIN TNC 620 User Manual

Setup, testing and running nc programs
Hide thumbs Also See for TNC 620:
Table of Contents

Advertisement

Tools | Tool data
Prerequisites for a tool change with M101
As replacement tools, use only tools with the same
radius. The control does not automatically check the
radius of the tool.
If you want the control to check the radius of the
replacement tool, enter M108 in the NC program.
The control performs the automatic tool change at a suitable point in
the program. The automatic tool change is not performed:
During execution of machining cycles
While radius compensation (RR/RL) is active
Directly after an approach function APPR
Directly before a departure function DEP
Directly before and after CHF and RND
During execution of macros
During execution of a tool change
Directly after a TOOL CALL or TOOL DEF
During execution of SL cycles
Overtime for tool life
This function must be enabled and adapted by the
machine manufacturer.
The tool condition at the end of planned tool life depends on e.g.
the tool type, machining method and workpiece material. In the
OVRTIME column of the tool table, enter the time in minutes for
which the tool is permitted to be used beyond the tool life.
The machine manufacturer specifies whether this column is enabled
and how it is used during tool search.

Tool usage test

Requirements
Refer to your machine manual.
The tool usage test function must be enabled by your
machine tool builder.
To conduct a tool usage test, you must activate Create tool usage
files in the MOD menu.
Further information: "Generating a tool usage file", Page 354
HEIDENHAIN | TNC 620 | User's Manual for Setup, Testing and Running NC Programs | 01/2022
4
145

Advertisement

Table of Contents
loading

This manual is also suitable for:

Tnc 620 eTnc 620 programming station

Table of Contents