Installing The Ptt Motor - SELVA MARINE Kingfish 25 Service Manual

Table of Contents

Advertisement

BRKT
2. Install the PTT motor lead 4, springs 5,
circuit breaker 6, brush holder 7, and
brushes 8 and 9, and then tighten the
screws 0 to the specified torque.
0
8
6
4
Brush holder screw 0:
1 N·m (0.1 kgf·m, 0.7 ft·lb)
3. Push the brushes 8 and 9 into the
brush holder, and then install the arma-
ture assembly A.
9
4. Install the stator B, and then tighten the
screws C to the specified torque.
B
C
C
Stator screw C:
2 N·m (0.2 kgf·m, 1.5 ft·lb)
9-65
Bracket unit
9
5
0
A
8

Installing the PTT motor

Do not reuse an O-ring, always replace it
with a new one.
5
1. Install a new O-ring 1, the joint 2, the
spring 3, and the PTT motor assembly
4, and then tighten the bolts 5 to the
7
specified torque.
4
5
5
PTT motor assembly bolt 5:
7 N·m (0.7 kgf·m, 5.2 ft·lb)
5
5
1
3
2

Advertisement

Table of Contents
loading

Table of Contents