7. Repeat steps 5–6 in to fully extend and
retract the tilt ram 4 to 5 times.
8. Fully extend the tilt ram.
9. Remove the reservoir cap, and then
check the fluid level in the reservoir.
WARNING! Make sure that the tilt ram
is fully extended when removing the
reservoir cap. Otherwise, fluid can
spurt out from the unit due to internal
pressure.
TIP:
If the fluid is below the proper level, add the
recommended PTT fluid up to the proper
level. Repeat steps 4–8 until the fluid remains
at the proper level.
10. Install a new O-ring and the reservoir
cap, and then tighten the reservoir cap to
the specified torque.
Reservoir cap: 7 N·m (0.7 kgf·m, 5.2 ft·lb)
PTT cylinder
9
9-78