Suzuki Wagon R Manual page 615

Hide thumbs Also See for Wagon R:
Table of Contents

Advertisement

6F1-8 IGNITION SYSTEM (ELECTRONIC IGNITION SYSTEM)
5) Fix ignition timing to initial one as follows.
When using SUZUKI scan tool:
Select "MISC" mode on SUZUKI scan tool and fix ignition tim-
ing to initial one.
When not using SUZUKI scan tool:
Disconnect scan tool from DLC, and connect D and E terminals
of diagnosis connector (1) or E to body ground by using service
wire so that ignition timing is fixed on initial one.
6) Open air cleaner upper case and shift upper case and hose
position to observe ignition timing.
7) Using timing light (1), check that ignition timing is within specifi-
cation.
Initial ignition timing (Test switch
terminal grounded or fixed with
SUZUKI scan tool)
Ignition order
8) If ignition timing is out of specification, check the followings:
D CKP sensor
D Crankshaft timing belt pulley (signal rotor)
D TP sensor
D Test switch signal circuit
D VSS
D Timing belt cover installation
9) After checking Initial Ignition Timing, release ignition timing
fixation by using SUZUKI scan tool or disconnect service wire
from diagnosis connector.
10) With engine idling (test switch terminal ungrounded, throttle
opening at closed position and car stopped), check that ignition
timing is about 9_–15_ BTDC. (Constant variation within a few
degrees from 9_–15_ indicates no abnormality but proves op-
eration of electronic timing control system.) Also, check that in-
creasing engine speed advances ignition timing.
If above check results are not satisfactory, check CKP sensor,
test switch terminal circuit and ECM.
11) Install air cleaner upper case.
: 5 " 3_ BTDC at idle speed
: 1-3-4-2

Hide quick links:

Advertisement

Chapters

Table of Contents
loading

Table of Contents