Suzuki Wagon R Manual page 210

Hide thumbs Also See for Wagon R:
Table of Contents

Advertisement

11) Install LSPV spring (1) to rear axle (2) (if equipped).
Tightening Torque
(a)
(a): 26 N·m (2.6 kg-m, 19.0 lb-ft)
12) Install brake drums (right & left). For details, refer to steps 3)
to 8) of BRAKE DRUM INSTALLATION in Section 5C.
13) Fill reservoir with brake fluid and bleed brake system. (For
bleeding operation, see SECTION 5.)
14) Install wheel and tighten wheel nuts to specified torque.
Tightening Torque
(d): 85 N·m (8.5 kg-m, 61.5 lb-ft)
15) Upon completion of all jobs, depress brake pedal with about
30 kg (66 Ibs) load three to five times so as to obtain proper
drum-to-shoe clearance.
Adjust parking brake cable. (for adjustment, see SECTION 5.)
16) Install console box.
17) Lower hoist and bounce vehicle up and down several times to
stabilize suspension.
REAR SUSPENSION 3E-17

Hide quick links:

Advertisement

Chapters

Table of Contents
loading

Table of Contents