Avaya Definity SI Maintenance Manual page 966

Table of Contents

Advertisement

Maintenance Object Repair Procedures
Signaling Link Status Test (#626)
This test determines the current status of the signaling link. This test passes if the
link is "bound" to an endpoint and fails if the link is "not bound."
The definition of the term "bound" for a link depends upon the type of endpoint
and may depend on the successful completion of procedures at both Layers 2 and
3 of the protocol. The definition of "bound" for ASAI type of endpoint is:
ASAI adjuncts and BRI endpoints not administered for MIM initialization
(point-to-point):
For endpoints of this type, the signaling link is "bound" when the link is
connected at Layer 2 (L2 established).
Table 10-58. TEST #626 Signaling Link Status Test
Error
Code
1139
1141
1144
10-180
Issue 4 May 2002
Test
Result
ABORT
The Packet Bus in the port network is out-of-service.
1. Follow the repair procedures for the Packet Bus.
2. After completing Step 1, execute the test port long
PCSSpp command and review the results of the BRI Port
Local LAN Looparound Test to verify the repair.
ABORT
The PKT-CTRL is out-of-service.
1. Refer to PKT-CTRL maintenance documentation.
ABORT
The PPN Packet Bus is out-of-service.
1. Follow the repair procedures for the Packet Bus in the
PPN.
2. Execute the test port long PCSSpp command and
review the results of the BRI Port Local LAN Looparound
Test to verify the repair.
Description/Recommendation
Continued on next page
555-233-123

Advertisement

Table of Contents
loading

Table of Contents