Avaya Definity SI Maintenance Manual page 822

Table of Contents

Advertisement

Maintenance Object Repair Procedures
System Technician-Demanded Tests: Descriptions
and Error Codes
Always investigate tests in the order presented in the table below. By clearing
error codes associated with the Loop Around Test #161 for example, you may
also clear errors generated from other tests in the testing sequence.
Order of Investigation
Loop Around Test (#161)
Conference Test (#7)
NPE Crosstalk Test (#6)
1
D = Destructive; ND = Nondestructive
NO-OP Tests
The maintenance strategy for EMBEDDED AUDIX emulates the one for
ANL-16-L. The tests listed below apply only to ANL-16-L and not to EMBEDDED
AUDIX. These tests always return PASS.
Battery Feed Test (#35)
Audits and Updates Test (#36)
Station Present Test (#48)
Tests 36 and 48 ABORT when AUDIX is not running.
NPE Crosstalk Test (#6)
This test verifies that this port's NPE channel talks on the selected time slot and
never crosses over to time slots reserved for other connections. If the NPE is not
working correctly, one-way and noisy connections may be observed. This test is
part of the long test sequence and takes about 25 seconds to complete.
10-36
Issue 4 May 2002
Short Test
Long Test
Sequence
Sequence
X
X
X
1
D/ND
ND
ND
ND
555-233-123

Advertisement

Table of Contents
loading

Table of Contents