Avaya Definity SI Maintenance Manual page 1408

Table of Contents

Advertisement

Maintenance Object Repair Procedures
NPE Connection Audit Test (#50):
The system sends a message to the on-board microprocessor to update the
network connectivity translation for all the Network Processing Elements (NPEs)
on the circuit pack.
Table 10-231. TEST #50 NPE Connection Audit Test
Error
Code
Test Result
None
ABORT
2100
1019
ABORT
FAIL
PASS
0
NO BOARD
10-622
Issue 4 May 2002
Description/Recommendation
System resources required for this test are not available.
Test already in progress.
Internal system error
1. Retry the command at 1-minute intervals a maximum of 5
times.
The circuit pack's NPEs have been updated with their
translation.
The test could not relate the internal ID to the port (no board).
This could be due to incorrect translations, no board is
inserted, an incorrect board is inserted, or an insane board is
inserted.
1. Check to ensure that the board translations are correct.
Use the add ds1 UUCSS command to administer the DS1
interface if it is not already administered.
2. If board was already administered correctly, check the
error log to determine if the board is hyperactive. If this is
the case, the board is shut down. Reseating the board will
re-initialize the board.
3. Issue the busyout board command.
4. Issue the reset board command.
5. Issue the release busy board command.
6. Issue the test board long command.
This should re-establish the linkage between the internal ID
and the port.
Continued on next page
555-233-123

Advertisement

Table of Contents
loading

Table of Contents