Mitsubishi Electric MELSEC iQ-R Series Programming Manual page 1667

Hide thumbs Also See for MELSEC iQ-R Series:
Table of Contents

Advertisement

Processing details
• This instruction sets the network parameters in the master station and starts up the data link.
• This instruction can be executed only for the master station.
• The following figure shows how the G(P).RLPASET instruction operates during execution.
CPU module
G(P).RLPASET
(d)
 The network parameters specified by (s1) to (s5) are written to the master station.
 The data link is started up.
 The device specified by (d) is turned on.
• The completion status of the G(P).RLPASET instruction can be checked with the completion device (d) and the completion
status indication device (d)+1.
• Completion device (d)
This device turns on during END processing of the scan where the G(P).RLPASET instruction completes, and turns off during the next END processing.
• Completion status indication device (d)+1
This device turns on or off depending on the completion status of the G(P).RLPASET instruction.
When completed successfully: The device remains off.
When completed with an error: The device turns on during END processing of the scan where the G(P).RLPASET instruction completes, and turns off during the
next END processing.
CC-Link master station
Ò
Module parameter
Ô
Ó
19 CC-LINK INSTRUCTIONS
19.7 Setting Network Parameters
19
1665

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents