Mitsubishi Electric MELSEC iQ-R Series Programming Manual page 1988

Hide thumbs Also See for MELSEC iQ-R Series:
Table of Contents

Advertisement

2.
Function block with EN/ENO
The execution conditions and operation results will be as follows.
Execution condition
EN
TRUE (executed)
FALSE (not executed)
• Timing chart
When (n)=3
ON
EN
OFF
ON
(s1)
OFF
OFF
(s2)
OFF
(s3)
OFF
(s4)
OFF
ON
ENO
OFF
(d1)
OFF
ON
(d2)
OFF
0
1
(d3)
(1)
(1) When (s1) turns on while EN is on, the value in (d3) is counted up.
(2) When (s3) turns on while EN is on, the value in (d3) is initialized.
(3) When (s2) turns on while EN is on, the value in (d3) is counted down.
(4) When (s4) turns on while EN is on, the value in (d3) is initialized.
Operation error
There is no operation error.
36 COUNTER/TIMER FUNCTION BLOCKS
1986
36.3 Up/Down Counter
Operation result
ENO
TRUE
FALSE
ON
ON
ON
ON
ON
OFF
OFF
OFF
OFF
ON
ON
OFF
OFF
ON
ON
2
0
(2)
ON
ON
ON
ON
ON
ON
OFF
OFF
OFF
ON
ON
OFF
ON
ON
ON
ON
1
0
(3)
(4)
(d1), (d2), (d3)
Operation result output value
Previous output value
ON
ON
ON
ON
OFF
OFF
OFF
ON
3
2
1

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents