Sirona teneo Operating Instructions Manual page 127

Hide thumbs Also See for teneo:
Table of Contents

Advertisement

Sirona Dental Systems GmbH
Operating Instructions (USA) TENEO
65 48 510 D3509
D3509.201.03.03.23 10.2016
4.5.15.2.5
Selecting a work step
Individual settings can be made and saved for each implantology work
step, e.g. predrilling, final drilling, tapping, etc., see "Saving settings"
[ → 129]. At the end of each work step, the required settings can be
accessed immediately by selecting the next step.
The number of work steps can be set; see "Setting the number of work
steps" [ → 129].
Implantology program
The
➢ Select the required implantology work step. Touch the
next work step
 The selected work step is displayed on the touchscreen. The
settings saved in the work step are preset.
If NaCl rinsing was selected in the
Rotation
key is displayed instead of the
implantology steps can be run through only in a forward loop. See
"Preselecting NaCl rinsing, setting the flow rate, and activating the rinse
function" [ → 128].
is displayed on the touchscreen.
key.
Implantology
previous work step
4 Operation
4.5 Dentist element
previous
or
CCW
sub-screen, the
key. The
127

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Teneo

Table of Contents