Sirona Dental Systems GmbH Installation Requirements TENEO Table of contents General information....................Notes on the installation prerequisites ............Identification of the danger levels..............Safety information ....................Installation by qualified personnel ..............Cellular phones ..................... Modifications and extensions of the system..........
General information Notes on the installation prerequisites Notes on the installation prerequisites TENEO product This document describes the installation prerequisites for the TENEO treatment center. It contains the following information: ● Required information for practice planning. ● Information for the installer, such as how to implement the connections for air, water, waste water, suction air and the power supply.
Sirona accessories or third-party accessories expressly approved by Sirona. The user assumes the risk of using non-approved accessories. If any devices not approved by Sirona are connected, they must comply with the applicable standards, e.g.: ● IEC 60950 for information technology equipment (e.g. PC) and ●...
Sirona Dental Systems GmbH 2 Safety information Installation Requirements TENEO 2.4 Power connection Power connection Power connection WARNING Shock hazard It is essential that you switch off the power supply PRIOR to beginning the installation. There is a risk of electric shock. People can be injured or electrical components of the unit destroyed.
3 On-site installation Sirona Dental Systems GmbH 3.1 Substrate, floor Installation Requirements TENEO On-site installation On-site installation Substrate, floor Substrate, floor Unevenness The floor must be level and horizontal in accordance with DIN 18 202. The shimming plates (A) in the accessory pack can be used for evennesses of up to 2 mm.
Sirona Dental Systems GmbH 3 On-site installation Installation Requirements TENEO 3.3 Media quality Media quality Media quality < 0,18 bar > 500 l/min 1 bar = 14.5 PSI < 7,5 bar > 2,5 bar > 5,5 bar < 6,0 bar >...
Page 10
3 On-site installation Sirona Dental Systems GmbH 3.3 Media quality Installation Requirements TENEO Water quality Lime deposits and corrosion residues in tap water can lead to the following malfunctions: ● Premature clogging of the filters in the unit ● Rapid clogging of the fine water paths and jets in the treatment...
Page 11
Sirona Dental Systems GmbH 3 On-site installation Installation Requirements TENEO 3.3 Media quality Air quality Air quality The air for driving the turbines, for cooling the drives and for the cooling spray must be free from oil, dry and hygienically faultless.
3 On-site installation Sirona Dental Systems GmbH 3.4 Above-floor installation of supply lines Installation Requirements TENEO Above-floor installation of supply lines Above-floor installation of supply lines Alternative line feed Above and underfloor installation The supply lines can be installed above the floor (above-floor installation) or through the floor (underfloor installation).
Installation template We recommend that you order the installation template (REF 33 15 830) from Sirona for laying the pipe ends in the installation field. If necessary, you can also prepare the template yourself based on the diagram below. 61 93 739 D3509...
Page 14
3 On-site installation Sirona Dental Systems GmbH 3.5 Underfloor installation of supply lines Installation Requirements TENEO Water supply Pipe 10x1 mm, corner valve outlet 3/8" Compressed air supply Pipe 10x1 mm, corner valve outlet 3/8" Suction line DN40 HT-PP ISO 8283-3 (polypropylene, inner diameter 36.5 mm)
Sirona Dental Systems GmbH 3 On-site installation Installation Requirements TENEO 3.5 Underfloor installation of supply lines 3.5.2 Installation of the supply line in the termination panel Installation of the supply line in the termination panel ✔ An installation template is available or was prepared.
3 On-site installation Sirona Dental Systems GmbH 3.6 Cleaning the air and water pipes Installation Requirements TENEO Cleaning the air and water pipes Cleaning the air and water pipes Flushing the air and water pipes NOTICE Chips and other foreign materials could be flushed and/or blown into the treatment center.
The cable channel No. 9 of the installation template is used for this purpose, see Installation template [ → 13]. PC connection with TENEO USB Cable set for PC connection with HDMI and USB cable for camera SiroCam, REF 63 29 655...
Page 18
3 On-site installation Sirona Dental Systems GmbH 3.7 Underfloor installation of the PC connections Installation Requirements TENEO Minimum PC requirements IMPORTANT Minimum requirements for PC See document "Installation instructions and system requirements for PC configuration," (REF 61 94 075) SIVISION digital.
Sirona Dental Systems GmbH 4 Dimensions, technical data Installation Requirements TENEO 4.1 Scale 1:20 Dimensions, technical data Dimensions, technical data Scale 1:20 Scale 1:20 4.1.1 Dimensions of the treatment room Dimensions of the treatment room 1700 1300 67” 51 3/16”...
Sirona Dental Systems GmbH 4 Dimensions, technical data Installation Requirements TENEO 4.2 Mounting plates Mounting plates Mounting plates Adapter plate If the dental treatment center is being installed as a replacement for an M1 previously installed at this location, an adapter plate is available for this purpose.
Page 24
4 Dimensions, technical data Sirona Dental Systems GmbH 4.2 Mounting plates Installation Requirements TENEO Demonstration chair plate For floors which do not permit permanent connection of the unit (e.g. demo operation at a trade show, floor heating), installation on a steel demo plate is possible.
Information on planning for the practice The following file(s) for practice planning are available for download in the dealer area of the Sirona website under DOWNLOADS => CAAD files: ● PDF file with print symbol - for to-scale printing on paper or adhesive film ●...
4 Dimensions, technical data Sirona Dental Systems GmbH 4.4 Technical data Installation Requirements TENEO Technical data Technical data Model designation, power ratings Model designation: TENEO Power connection: 100 - 230 V AC ± 10% 50/60 Hz Rated current: 4.8 A at 230 V 9.6 A at 115 V...
Page 27
Sirona Dental Systems GmbH 4 Dimensions, technical data Installation Requirements TENEO 4.4 Technical data Operating conditions: Ambient temperature: 10°C – 40°C (50°F – 104°F) Relative humidity: 30% – 85% no condensation Air pressure: 700 hPa – 1060 hPa Installation site: ≤...
4 Dimensions, technical data Sirona Dental Systems GmbH 4.5 Standards/Approvals Installation Requirements TENEO Standards/Approvals Standards/Approvals Compliance with standards ® The TENEO treatment center complies with the following standards, among others: ● IEC 60601-1 (electrical and mechanical safety plus software reliability) ●...
Page 29
The current approvals of the wireless foot control are listed on the rating label on the underside of the wireless foot control. Product name is a registered trademark ® TENEO is a registered trademark of Sirona Dental Systems GmbH. 61 93 739 D3509 D3509.021.01.12.02 08.2013...
Accessories approved by Sirona The UNIT may only be operated with accessories and spare parts approved by Sirona. Unapproved accessories and spare parts may lead to an increased emission or to a reduced immunity to interference. The UNIT should not be operated in the immediate vicinity of other devices.
Sirona Dental Systems GmbH 5 Electromagnetic compatibility Installation Requirements TENEO 5.2 Electromagnetic emission Electromagnetic emission Electromagnetic emission The UNIT is intended for operation in the electromagnetic environment specified below. The customer or user of the UNIT should make sure that it is used in such an environment.
5 Electromagnetic compatibility Sirona Dental Systems GmbH 5.3 Interference immunity Installation Requirements TENEO Interference immunity Interference immunity The UNIT is intended for operation in the electromagnetic environment specified below. The customer or user of the UNIT should make sure that it is used in such an environment.
5 Electromagnetic compatibility Sirona Dental Systems GmbH 5.4 Working clearances Installation Requirements TENEO Working clearances Working clearances Recommended working clearances The UNIT is intended for operation in an electromagnetic environment between portable and mobile RF where radiated HF interference is checked. The customer or the user of...
Sirona Dental Systems GmbH 5 Electromagnetic compatibility Installation Requirements TENEO 5.5 Foot control wireless interface Foot control wireless interface Foot control wireless interface Insofar as the treatment center is equipped with a foot control, one wireless module each must be installed in the foot control and in the base of the chair of the treatment center.
We recommend performing an inspection of the circumstances on location at least 4 weeks prior to installation. The checklist should help you when doing this. This can help ensure a smooth procedure on the day that the TENEO is actually installed. Installation site: ●...
Sirona Dental Systems GmbH 6 Checklist Installation Requirements TENEO 6.2 Construction requirements Construction requirements Construction requirements Connections: Media (see On-site installation [ → 8]) ☑ ● Water supply ☐ Pipe 10x1 mm, corner valve outlet 3/8" ● Compressed air supply line ☐...
6 Checklist Sirona Dental Systems GmbH 6.3 IT hardware Installation Requirements TENEO IT hardware IT hardware Mode of operation: ☑ ● Stand-alone solution (mini PC required in the base of the chair) ☐ ● PC in treatment room ☐ PC system requirements: ☑...
● Network connection for TENEO available. ☐ ● Network connection for external PC available. ☐ NOTICE! The use of routers between TENEO and the treatment center PC must be avoided. ● Network configuration plan available. ☐ ● Network jacks have been certified. ☐...
● Is there a DHCP server (dynamic TCP/IP address assignment)? ☐ Yes ☐ No NOTICE! A static address should be assigned for the TENEO. It must not lie in the dynamic address range! ● TENEO: _____ . _____ . _____ . ____ ●...